XM은(는) 미국 국적의 시민에게 서비스를 제공하지 않습니다.

What's at stake for EDF in Czech nuclear tender?



<html xmlns="http://www.w3.org/1999/xhtml"><head><title>EXPLAINER-What's at stake for EDF in Czech nuclear tender?</title></head><body>

By Benjamin Mallet

PARIS, April 30 (Reuters) -The stakes are high for France's nuclear power operator EDF, as it waits for the results of a tender to build up to four new reactors in the Czech Republic.

The French state-owned company said on Tuesday that it had submitted an updated bid for the project and expects a decision from Czech utility CEZ CEZP.PR this year.


WHY IS THIS PROJECT IMPORTANT FOR EDF?

If it wins, it would be the company's first overseas contract since it landed the Hinkley Point project in Britain in 2016, marking a major vote of confidence in the company.

At home, EDF has yet to complete its first EPR (European Pressurized Reactor) at Flamanville after a delay of 12 years and faces scepticism about its ability to execute plans for another six new reactors in the country.

"Everyone has an eye on Prague's decision," Vakis Ramany, EDF senior vice president in charge of international new nuclear development, said ahead of the bid submission.


WHY IS THE CZECH CONTRACT IMPORTANT FOR EUROPE?

A win is not just critical to the company but also to its strategy to lower costs and increase the efficiency of other nuclear reactors planned in France and across Europe.

Europe's leading nuclear power-plant builder aims to deliver one or two reactors a year on the continent from the 2030s, a pace not seen since France commissioned its fleet of nuclear stations in the 1980s and 1990s.

"This is the pace necessary for us to continue to consistently improve our performance from one project to the next, so that synergies can be maximised," said Ramany.

EDF is pushing for a major revival of nuclear power in Europe, which it says is essential to cut carbon emissions and strengthen energy security.


WHO ELSE IS BIDDING?

EDF is up against tough competition from Korea Hydro & Nuclear Power (KHNP), a subsidiary of Korean conglomerate KEPCO.

The Korean company beat EDF 15 years ago on a bid to build four reactors in the United Arab Emirates, after the French company entered the process late and with higher costs.

KHNP's bid likely has much lower costs, say industry participants.

The cost of a single EDF reactor is around 10 billion euros ($10.73 billion), according to French newspaper Les Echos.

EDF declined to comment on the estimate, as well as costs in its proposal. KHNP also declined to comment on costs.

The bill for EDF's Flamanville EPR is now at 13.2 billion euros ($14.14 billion), while the two Hinkley Point reactors are expected to cost up to 35 billion pounds ($43.93 billion) based on 2015 values.

U.S. company Westinghouse WAB.N has withdrawn from the tender.


WHAT ARE EDF'S CHANCES OF SUCCESS?

EDF should benefit from its proximity to the Czech Republic, and its proposal to involve Czech industry in the project, said Marc-Antoine Eyl-Mazzega, director of the Energy and Climate Center at the French Institute of International Relations.

However, EDF has never built an EPR1200, a simplified version of its classic EPR that it is proposing for the Czech tender, and still needs certification for the new model.

"It must pass this absolutely crucial stage so that the Czech authorities are convinced and have full confidence," said Eyl-Mazzega.

There are also still questions over whether Prague will be able to finance the project, he added, describing it as "a "colossal financial gamble".



($1 = 0.9321 euros)

($1 = 0.7967 pounds)



Reporting by Benjamin Mallet. Additional reporting by Joyce Lee in Seoul. Writing by Dominique Patton
Editing by Marguerita Choy and Louise Heavens

</body></html>

면책조항: XM Group 회사는 체결 전용 서비스와 온라인 거래 플랫폼에 대한 접근을 제공하여, 개인이 웹사이트에서 또는 웹사이트를 통해 이용 가능한 콘텐츠를 보거나 사용할 수 있도록 허용합니다. 이에 대해 변경하거나 확장할 의도는 없습니다. 이러한 접근 및 사용에는 다음 사항이 항상 적용됩니다: (i) 이용 약관, (ii) 위험 경고, (iii) 완전 면책조항. 따라서, 이러한 콘텐츠는 일반적인 정보에 불과합니다. 특히, 온라인 거래 플랫폼의 콘텐츠는 금융 시장에서의 거래에 대한 권유나 제안이 아닙니다. 금융 시장에서의 거래는 자본에 상당한 위험을 수반합니다.

온라인 거래 플랫폼에 공개된 모든 자료는 교육/정보 목적으로만 제공되며, 금융, 투자세 또는 거래 조언 및 권고, 거래 가격 기록, 금융 상품 또는 원치 않는 금융 프로모션의 거래 제안 또는 권유를 포함하지 않으며, 포함해서도 안됩니다.

이 웹사이트에 포함된 모든 의견, 뉴스, 리서치, 분석, 가격, 기타 정보 또는 제3자 사이트에 대한 링크와 같이 XM이 준비하는 콘텐츠 뿐만 아니라, 제3자 콘텐츠는 일반 시장 논평으로서 "현재" 기준으로 제공되며, 투자 조언으로 여겨지지 않습니다. 모든 콘텐츠가 투자 리서치로 해석되는 경우, 투자 리서치의 독립성을 촉진하기 위해 고안된 법적 요건에 따라 콘텐츠가 의도되지 않았으며, 준비되지 않았다는 점을 인지하고 동의해야 합니다. 따라서, 관련 법률 및 규정에 따른 마케팅 커뮤니케이션이라고 간주됩니다. 여기에서 접근할 수 있는 앞서 언급한 정보에 대한 비독립 투자 리서치 및 위험 경고 알림을 읽고, 이해하시기 바랍니다.

리스크 경고: 고객님의 자본이 위험에 노출 될 수 있습니다. 레버리지 상품은 모든 분들에게 적합하지 않을수 있습니다. 당사의 리스크 공시를 참고하시기 바랍니다.